To minimize co-channel interference and to conserve power, both the
mobiles and the base station (BS) operate at the lowest
power level at which an acceptable signal quality can be
maintained. Power levels can be stepped up or down in
steps of 1 dB from the peak power. The CDMA
base station can change the power from a mobile 800
times per second.
Signal quality is measured by mobile and base
station.