AT&E

Systems Engineering Glossary

Systems EngineeringSystems EngineeringTest And Evaluation — AT&E

 

 

 

 

 

 

Argos Home

 

 
 


Information on AT&E

AT&E provides formal acceptance testing on behalf of customer. AT&E therefore forms the boundary between the Acquisition Phase and the Utilisation Phase. AT&E can be conducted by the customer before accepting the system, but it is more common these days for the customer to approve the test procedures and ten oversee the contractor conduct the testing.
     Acceptance Test and Evaluation is focused on confirming that delivered system meets the system-level requirements contained in the contractual documents (normally the System Specification and the Functional Baseline).
     On successful conclusion of AT&E, the system is accepted and will formally enter the Utilisation Phase.


Other topics in our resources on Systems Engineering related to AT&E include: 
 
  • Metric
  • Test Management
  • Developmental Test And Evaluation (DT&E)
  • Operational Test And Evaluation (OT&E)
  •  

    If you would like to propose other words or phrases for our glossary, please contact Argos Press. © Argos Press Pty Ltd, Canberra, 2003-2004. All rights reserved. Please also contact Argos Press Pty Ltd to seek permission to broadcast, adapt, reproduce and communicate content from this web site (including this glossary entry on AT&E).