OT&E

Systems Engineering Glossary

Systems EngineeringSystems EngineeringTest And Evaluation — OT&E

 

 

 

 

 

 

Argos Home

 

 
 


Information on OT&E

OT&E is focused on functional or operational testing of the system, and is generally undertaken by users following acceptance of the system into service.
     Some Operational Test and Evaluation can occur earlier during Acquisition Phase, particularly for large, phased projects where the customer wants to assess the ability of the system to meet the original needs (as articulated and modified during Conceptual Design).
     Normally, to ensure objectivity, OT&E is conducted by a testing agency within the customer’s organisation that is independent from the acquiring agency within the customer’s organisation.


Other topics in our resources on Systems Engineering related to OT&E include: 
 
  • Metric
  • Test Management
  • Acceptance Test And Evaluation (AT&E)
  • Developmental Test And Evaluation (DT&E)
  •  

    If you would like to nominate related entries for the glossary, please contact Argos Press. © Argos Press Pty Ltd, Canberra, 2003-2004. All rights reserved. Please also contact Argos Press Pty Ltd to obtain information on licensing Argos Press content (such as this entry on OT&E).