CHANGE REPORT

Systems Engineering Glossary

Systems EngineeringSystems EngineeringConfiguration ManagementChange Management — Change Report

 

 

 

 

 

 

Argos Home

 

 
 


Information on Change Report

Once an endorsed change has been made to a configuration item a change report closes the change management loop and reports to the Change Control Board (CCB) on the outcome of the change.


Other topics in our resources on Systems Engineering related to Change Report include: 
 
  • Change Request
  • Change Control Board (CCB)
  • Engineering Change Proposal (ECP)
  •  

    Please contact Argos Press if you wish to propose new words or phrases to improve our glossaries. © Argos Press Pty Ltd, Canberra, 2003-2004. All rights reserved. Please contact Argos Press to obtain information on licensing our content (such as this glossary entry on Change Report).