The acquisition element of the customer organisation will invariably complete
the Conceptual Design and outsource the remaining Acquisition Phase activities
to a prime contractor through a contract. The contractor is
therefore normally responsible for the Preliminary Design, Detailed Design and
Development, Construction and/or Production activities finishing with acceptance by the
acquirer at a Formal Qualification Review. In some cases, the
contractor may not be able to perform all the work
required within the contractor's organisation and they make engage subcontractors
to assist in the completion of the task. Normally, the
conditions of the prime contract flow down into the subcontract.